Great news!!

I just wrote your next PLC program for you.

You'll finish FAST by starting your next project with all of the following:
– 50 digital inputs AND 50 digital outputs already created and ready to be aliased to your IO
– 50 analog inputs and 50 analog outputs already scaled and protected from out-of-range values
– 50 digital alarms already set up with alarm bits, notification bits, a reset and a silence
– 100 LL and HH alarms with operator-settable limits already built for the analog inputs
– Full HOA control circuits already built for all 50 digital output devices
– A full-featured hourmeter already ready to run with a safety reset
– A Project Report provided for reference to all of the memory registers used in the project
– Clear, easily understood tag names for all used memory
– Created in Studio 5000 v20 using only LD. So this is compatible with ANY version of RSLogix / Studio 5000 that’s been released within the last 10 years or so.

All already set up for you!

Congratulations on Getting That New Project!

Now, Where Do You Begin?

What would it be worth to you if I offered to write over half of your next Studio 5000 PLC Project? Well, that’s exactly what I’m offering. This is going to save you a LOT of time and make you a LOT of MONEY.
For that matter, what if I offered to do the same for every 5000 project you ever create? You'd never have to start off from a blank canvas again.

Looking at that empty project window at the beginning of a new project is the WORST feeling.

There’s SO MUCH to do. When you first start on a new project, there’s a ton of redundant grunt work that takes days to finish and always has bugs and typos by the end. If you don’t have a good process established, it takes even longer to figure out how best to set it all up. There’s usually a lot of rework and inconsistency as you jump between program files trying to remember which registers you used and how you formatted your descriptions. Time is money, and creating alarms and IO and HOAs and all that over and over again sucks up a LOT of it. This template fixes all of that for you. Every bit of this is already done for you. You will EASILY reduce your PLC programming time by 50-90% starting from this template. And you can use it for every 5000 project you ever do again!

Scaled for Anything

Scaling 100 analogs isn’t hard, but it takes time to handle the over/under signals and setpoints for operator-settable ranges.

Let’s face it – getting all that in there clean and right is a few days’ worth of work.
Testing all of that once you’ve coded it takes even more time.
Good news: you really don’t need to go through all that in 5000 ever again. I’ve done all the heavy lifting for you. All you have to do is insert your IO addresses and tweak the descriptions. DONE!

Coding Proper Alarms Is a NIGHTMARE!

Don’t you hate creating all those alarms four lines at a time?

Do you sometimes skimp on the notification bits just to save time?
No worries: I did it all for you already, and there are more fully developed alarms in there (all sequentially numbered even) than you’ll probably ever even need.

Imagine STARTING Your Next Studio 5000 Project from HERE

If you had started your last 5000 project from my template, how long would it have taken you?

If all of your alarms and HOAs and IO were already done and error-free, how much debugging and testing could you have avoided?
How many projects have you developed that even required that many IO points? This can handle most of what you’re likely to ever throw at it.
If you’re developing projects from scratch, you’re losing money. It’s just that simple.
My 5000 Template will pay for itself literally the second you open it (to start a project). Less time programming means more projects you can take on and that’s money in the bank. YOUR bank! So yeah – if you do any 5000 work, definitely buy this. It’s a total no-brainer.